Croswell, Michigan System Installation & Start Up Photos

Where: Croswell, Michigan (about 90 minutes north of Detroit)

What: A 0.5 MGD design/ 1.3 MGD peak MBBR Retrofit of a 40 year old municipal plant

How: Two trains of three-stage MBBRs featuring 60 HP blowers & 240 of m3  AC500 Media

Why: Older, failing equipment; needed to upgrade plant in order to nitrify in a tight footprint

Who: Collaboration between AquaPoint, Kennedy Industries, Fleis & VandenBrink Engineering, & John E. Green Company

(Pro Tip: click on the thumbnails to enlarge the photos)